| SKU | Scope | Default crew | Formula | Used | Avg margin | Last used |
|---|---|---|---|---|---|---|
Antenna swap · per sector Remove and install one sector of antennas including jumpers and weatherproofing. | antenna_swap | NATE-4 | sectors × 6.5 | 34× | 29.5% | 2026-07-30 00:00:00+00 |
Coax / hybrid run · per line Hoist and secure one run of coax or hybrid cable from RRU to base. | tower_climb | NATE-3 | lines × 0.75 | 28× | 27.8% | 2026-07-28 00:00:00+00 |
Sweep + PIM test · per line Line sweep and PIM certification with closeout plots. | tower_climb | NATE-2 | lines × 0.5 | 26× | 35.4% | 2026-07-29 00:00:00+00 |
RRU install · per unit Mount, cable, and commission one remote radio unit. | antenna_swap | NATE-4 | units × 3.25 | 22× | 31.2% | 2026-07-24 00:00:00+00 |
Tower climb · mobilization day Full crew day on structure including rigging setup and tear-down. | tower_climb | NATE-4 | crew_size × 8 | 19× | 26.4% | 2026-07-31 00:00:00+00 |
Ground bar + exothermic bond Install ground bar and exothermic bonds to the ring. | grounding | GRND-2 | bonds × 1.5 | 17× | 33.1% | 2026-07-17 00:00:00+00 |
Fiber splice · 24F tray Splice and test one 24-fiber tray, OTDR trace included. | fiber | FIBR-2 | trays × 4 | 14× | 30.6% | 2026-07-21 00:00:00+00 |
Foundation pour · per pad Excavate, form, set cage, and pour one equipment pad. | civil_foundation | CIVL-5 | pads × 22 | 11× | 24.9% | 2026-07-02 00:00:00+00 |
Generator pad + set Set standby generator on pad, terminate ATS, commission. | generator | ELEC-3 | sets × 16 | 8× | 28.3% | 2026-06-26 00:00:00+00 |
Site restoration & closeout Grade, seed, punch list, and closeout photo package. | other | GEN-2 | sites × 6 | 6× | 21.7% | 2026-06-12 00:00:00+00 |